Our current news and blog posts
Real Estate Insights: Latest News

Our current news and blog posts
27/05/2025
We’re proud to share the successful completion of another important construction milestone at the Glowing Star residential development, our 10-story flagship project located in Kalabria, Prishtina.
As we move closer to casting the 1.2-meter thick waterproof structural foundation slab, two critical preparatory layers have now been installed:
These layers form an essential part of the building envelope, ensuring both thermal insulation and moisture protection, while also enhancing the performance of the waterproof concrete system.
Benefits of the XPS Insulation Layer:
Role of the Polyethylene Membrane:
As we prepare for the upcoming foundation slab casting, this achievement represents a vital step in building a structure that is thermally efficient, watertight, and built to last.
Stay tuned for more updates as Glowing Star continues to rise layer by layer, milestone by milestone.